Larnaca SWRO

Plant Type

SWRO

Total Plant Output

64,000m³/day, 18 million cubic metres a year

Project Cost

$47m

Water Price

$0.79/m³

Annual Revenue Generation

$13m

Plant Footprint

160m x 100m

Pre-Treatment

Flocculation and dual media gravity filtration (intake); 10-micron filtration (RO train)

Number of RO Treatment Trains

7

Individual Unit Capacity

9,000m³/day, 10,000m³/day (expansion in 2008)

Component Pressure Vessels

120 per treatment train

Membrane Elements

8 per vessel

Intake Water Temperature

18°C to 26°C

Salinity

Raw water - 40,500ppm TDS; product water - <500ppm TDS

Desalination Process Nominal Electrical Consumption

3.4kWh/m&#179; product water

Maximum Nominal Electrical Consumption (including pumping feed and product water)

4.5kWh/m&#179; product water

Contract Signed

4 March 1999

Construction Commenced

December 1999

Completion

March 2001

Opened

April 2001

Expansion

2008

Client

Water Development Department of the Ministry of Agriculture, Cyprus

Owner Operators

Larnaca Desalination Partners (LWP), an IDE Technologies and Oceana Advanced Industries JV

Mechanical Systems

Tata Projects

Turbines

Calder AG

HP Pumps

Ingersoll-Dresser

Ductile Iron Pipes

Xinxing

Additional Engineering

Abacus Engineering (formerly Moedl Technisches Buero / Ingenieurbuero)

Water Management Software

InSyst

Finance Arranger

Hypo Vereins Bank (HVB Group)